Share the pattern
Describe planned-care questions, last service date and any change you have noticed.
Availability confirmed from postcode and system details
Service for an existing system should begin with a measured review of the outdoor unit, drainage and condensate routes, controls, electrical isolation and visible corrosion. Where access or external work touches traditional or conservation-area fabric, record the proposed work clearly and treat permissions as a separate planning question rather than assuming that routine maintenance is automatically covered.
Service for an existing system should begin with a measured review of the outdoor unit, drainage and condensate routes, controls, electrical isolation and visible corrosion. Where access or external work touches traditional or conservation-area fabric, record the proposed work clearly and treat permissions as a separate planning question rather than assuming that routine maintenance is automatically covered.
Describe planned-care questions, last service date and any change you have noticed.
Use your postcode, system details and requested support to confirm the appropriate availability and appointment route.
A service visit is shaped around condition, operation, controls and the care questions you have raised.
Use the booking form to provide your postcode and choose the support you need. That information is used to confirm the right next step.
These public sources inform the guide. They do not establish service availability or describe work by Heat Pumps Service.
Moray Council’s flood-risk plan identifies Forres as a Potentially Vulnerable Area and considers river, sea, surface-water and groundwater flooding. This is strategic background, not a current warning or a property-specific determination.
It can make access and any external alteration more sensitive, particularly around traditional buildings and varied architectural detail. Planning or heritage permissions are separate questions and should be checked with the relevant authority.